Railway Pedestrian Tunnel

Scope of Works

Railway Pedestrian Tunnel 250m2: To provide a high trafficable substrate suitable for heavy foot traffic with a slip resistant finish.

Solution

  • Prepare the floor by diamond grinding
  • Repair cracks and holes using Epoxy Putty
  • Install a 2mm-4mm Epoxy Matrix System giving a slip resistant finish

Online Enquiries

Where did you find us?: