Scope of Works
Railway Pedestrian Tunnel 250m2: To provide a high trafficable substrate suitable for heavy foot traffic with a slip resistant finish.
Solution
- Prepare the floor by diamond grinding
- Repair cracks and holes using Epoxy Putty
- Install a 2mm-4mm Epoxy Matrix System giving a slip resistant finish